Home Ooty BlogToy Train Engine Maintanance work

Toy Train Engine Maintanance work

Toy Train EngineUpdated by : Travel2ooty on December/10/2015

Nilgiri Mountain Railway is operating from Mettupalayam to Ooty.The engines of this century old  Ooty train is used to send to the Trichy Golden Rock Railway workshop for the maintenance work.

Accordingly the engine had sent to the Trichy railway workshop for the maintenance work.Yesterday night this engine has brought back to Mettupalayam Railway station through Truck.

The 140-ton crane will be used to put down the engine from the truck.This crane has to be enacted from the Erode on 13th of this month.